Wonderful 3-bedroom pool villa in the coconut grove

Bo Phut, Ko Samui District, Surat Thani, Thailand

Wonderful 3-bedroom pool villa in the coconut grove

Bophut, North East, Koh Samui

Overview

  • Sold
  • Status
  • 3
  • Bedrooms
  • 3
  • Bathrooms
  • 149
  • Sqm.

Islands Of Siam Property Group Ltd is pleased to present this brand new Nestled off-plan villa project located in the Lamai area of ​​Koh Samui. This project embodies a harmonious fusion of tranquility and natural splendor.

This residence made up of 12 luxurious villas with two floor, only has 4 left for sale.

Each of the villas has three bedrooms with their own bathrooms, a modern and contemporary kitchen with island, a panoramic living room with breathtaking dining area, a guest toilet, an office area and a green garden including a spacious terrace as well as a 7x3m salt-treated swimming pool.
Experience the epitome of luxury living with these exquisite Western-style residential villas, meticulously designed to seamlessly blend traditional Balinese charm and contemporary elegance.

These villas also have a covered parking space for 1 car and 1 motorcycle, a deep well, electricity according to government rates, are sold with a Thai company and do not have commons area fees.

Sold unequipped, a supplies package will be offered 6 months before the end of construction work for 1,000,000 THB

Ideally located and meticulously designed, these villas are perfectly suited to families and are only 4 minutes from Windfield International School, 5 minutes from Main Road and essential amenities, 6 minutes from Lamai Beach, 9 minutes from Silver Beach, 30 minutes from Samui International Airport.

Work will begin in June 2024 and end in October 2025

Payment Plan:
- Payment 1+2: 40% for Reservation (day of set the deal)
10 percent for deposit and after checks and lawyers - one month the other 30..
- Payment 3: 20% for Completion of the first floor (no later than November 30, 2024)
- Payment 4: 20% for Completion of the second floor (no later than March 30, 2025)
- Payment 5: 15% for Building works, finishing, connecting systems (June 30, 2025)
- Payment 6: 5% for Delivery (estimate October 31, 2025)

Similar Listings

Compare listings

Compare
Miss Lancelot Christelle
  • Miss Lancelot Christelle